SUBSECRETARIA DE INFRAESTRUCTURA | |||||||
DIRECCION GENERAL DE CONSERVACION DE CARRETERAS | |||||||
Programa Nacional de Conservación de Carreteras | |||||||
Avance Fìsico - Financiero | |||||||
DICIEMBRE 2019 | |||||||
NOMBRE DE LA OBRA | UBICACIÓN | META | ASIGNACION |
AVANCE FISICO | AVANCE FINANCIERO |
||
Km Inicial | Km Final | UNIDAD | % | ||||
PUEBLA | 590,380,444.94 | 99.79 | 99.03 | ||||
RECONSTRUCCIÓN | 55,170,363.75 | 99.24 | |||||
Reconstrucción de Puentes | 6.00 | 55,170,363.75 | 6.00 | 100.00 | 99.24 | ||
Jazmín (Puebla-Lim. de Edos. Pue./Tlax.) | 1+200 | 1.00 | 7,516,099.51 | 1.00 | 100.00 | 100.00 | |
Tepexco I (Santa Barbara-Izucar de Matamoros | 107+100 | 1.00 | 8,701,557.43 | 1.00 | 100.00 | 97.25 | |
Oriental (Lim. de Edos. Tlax./Pue.-Teziutlan) | 60+590 | 1.00 | 9,080,861.05 | 1.00 | 100.00 | 99.43 | |
Grajales (Puebla-Lim. de Edos. Pue./Tlax.) | 33+100 | 1.00 | 9,291,689.96 | 1.00 | 100.00 | 99.50 | |
Petlalcingo (Izucar de Matamoros-Lim. de Edos Pue./Oax.) | 177+600 | 1.00 | 10,060,569.60 | 1.00 | 100.00 | 99.60 | |
Amatitlán (Izucar de Matamoros-Lim. de Edos Pue./Oax.) | 148+100 | 1.00 | 10,519,586.20 | 1.00 | 100.00 | 99.62 | |
1.00 | |||||||
Conservación Periódica | 207.30 | 323,696,312.45 | 207.30 | 100.00 | 99.69 | ||
Renivelación y Carpeta de 10.0 cm | 8.40 | 33,444,807.50 | 8.40 | 100.00 | 99.98 | ||
Puebla-Izucar de Matamoros mezcla de alto desempeño | 55.00 | 63.40 | 8.40 | 33,444,807.50 | 8.40 | 100.00 | 99.98 |
Renivelación y Carpeta de 5.0 cm | 64.80 | 155,131,082.44 | 64.80 | 100.00 | 99.92 | ||
Oriental-Teziután | 83.00 | 89.00 | 6.00 | 12,681,920.40 | 6.00 | 100.00 | 100.00 |
Amozoc-Tehuacan | 24.50 | 33.50 | 9.00 | 39,382,615.66 | 9.00 | 100.00 | 100.00 |
Lim. de Edos. Hgo./Pue.-Lim. de Edos. Pue./ver. | 82.90 | 86.00 | 3.10 | 11,520,081.36 | 3.10 | 100.00 | 100.00 |
Lim. de Edos. Hgo./Pue.-Lim. de Edos. Pue./ver. | 115.00 | 125.00 | 10.00 | 15,832,123.19 | 10.00 | 100.00 | 100.00 |
Lim. de Edos. Tlax./Pue.-Lim. de Edos. Pue./Hgo. | 69.20 | 81.20 | 12.00 | 20,515,922.40 | 12.00 | 100.00 | 100.00 |
Lim. de Edos. Tlax./Pue.-Lim. de Edos. Pue./Hgo. | 97.00 | 106.00 | 9.00 | 16,979,921.76 | 9.00 | 100.00 | 100.00 |
Izucar de Matamoros-Lim. de Edos. Pue./Oax. | 67.30 | 71.00 | 3.70 | 18,571,484.29 | 3.70 | 100.00 | 99.37 |
T. San Hipolito-Zacatepec | 24.00 | 36.00 | 12.00 | 19,647,013.38 | 12.00 | 100.00 | 100.00 |
Renivelación y Riego de Sello | 134.10 | 85,758,008.27 | 134.10 | 100.00 | 98.98 | ||
Zacatepec-Lim. De Edos. Pue./Ver. (2 Cpos.) | 54.00 | 83.30 | 58.60 | 24,917,514.35 | 58.60 | 100.00 | 99.54 |
Lim. de Edos. Mor./Pue.-T Cuatro Caminos | 103.00 | 134.50 | 31.50 | 27,920,868.92 | 31.50 | 100.00 | 100.00 |
Puebla-Huajuapan de Léon | 93.00 | 110.00 | 17.00 | 12,977,000.00 | 17.00 | 100.00 | 94.55 |
Lim. de Edos. Hgo./Pue.-Lim. de Edos. Pue./Ver. | 104.00 | 115.00 | 10.00 | 11,874,999.60 | 10.00 | 100.00 | 100.00 |
Amozoc-Teziutlan T/A | 65.00 | 82.00 | 17.00 | 8,067,625.40 | 17.00 | 100.00 | 99.35 |
Atención a Fallas Geológicas | 5.00 | 49,362,414.24 | 5.00 | 100.00 | 100.00 | ||
Pachuca-Tuxpan | 104+900 | 1.00 | 13,273,555.32 | 1.00 | 100.00 | 100.00 | |
Pachuca-Tuxpan | 108+600 | 1.00 | 9,613,708.85 | 1.00 | 100.00 | 100.00 | |
Pachuca-Tuxpan (Vegas de Suchil) | 0+700 | 1.00 | 4,999,398.62 | 1.00 | 100.00 | 100.00 | |
Pachuca-Tuxpan | 106+300 | 1.00 | 10,424,269.47 | 1.00 | 100.00 | 100.00 | |
Teziutlán-Perote | 6+400 | 1.00 | 11,051,481.98 | 1.00 | 100.00 | 100.00 | |
Conservación Periódica de Puentes | 10.00 | 7,000,000.00 | 10.00 | 100.00 | 100.00 | ||
Conservación Periódica de Puentes | 10.00 | 7,000,000.00 | 10.00 | 100.00 | 100.00 | ||
Puntos de conflicto | 2.00 | 13,200,000.00 | 2.00 | 100.00 | 93.68 | ||
Apizaco-Tejocotal | 52+500 | 53+500 | 1.00 | 10,000,000.00 | 1.00 | 100.00 | 100.00 |
Puebla-Tehuacán | 25+000 | 32+000 | 1.00 | 3,200,000.00 | 1.00 | 100.00 | 73.94 |
Conservación Rutinaria de Tramos | 1,005.96 | 90,932,568.40 | 1,005.96 | 100.00 | 97.58 | ||
Conservación Rutinaria de Tramos (Lineal del Estado) | 1,005.96 | 76,314,312.40 | 1,005.96 | 100.00 | 98.23 | ||
Conservación Rutinaria de Tramos ASI(contrato no. 534) | SM | 5,170,816.00 | 100.00 | ||||
Conservación Rutinaria de Tramos Nanosello(contrato no. 536) | SM | 4,447,440.00 | 100.00 | ||||
Gastos de Operación | GOP | 5,000,000.00 | 82.92 | ||||
Señalamiento Horizontal | 1,005.96 | 34,102,934.52 | 1,005.96 | 100.00 | 100.00 | ||
Señalamiento Horizontal (Lineal del Estado) | 1,005.96 | 34,102,934.52 | 1,005.96 | 100.00 | 100.00 | ||
Barrera de Protección | 10,840.00 | 12,468,397.81 | 10,840.00 | 100.00 | 100.00 | ||
Barrera de Protección (contrato no.531) | 10,840.00 | 12,468,397.81 | 10,840.00 | 100.00 | 100.00 | ||
Señalamiento Vertical | 10,360.00 | 31,948,057.20 | 10,360.00 | 100.00 | 99.76 | ||
Señalamiento Vertical (contrato no. 532) | 5,180.00 | 15,662,194.28 | 5,180.00 | 100.00 | 99.50 | ||
Señalamiento Vertical (contrato no. 533) | 5,180.00 | 16,285,862.92 | 5,180.00 | 100.00 | 100.00 | ||
Conservación Rutinaria de Puentes | 166.00 | 6,400,000.00 | 165.00 | 81.72 | 81.72 | ||
Conservación Rutinaria de Puentes (contrato no. 507) | 165.00 | 5,230,000.00 | 165.00 | 100.00 | 100.00 | ||
Conservación Rutinaria de Puentes (Pte. Río Zapotitlán km31+900) | 1.00 | 1,170,000.00 | 0.00 | 0.00 | 0.00 | ||
Otros Subprogramas | 15,461,810.81 | 100.00 | |||||
Estudios y/o Proyectos | SM | 12,701,453.81 | 100.00 | ||||
Seguimiento | SM | 2,760,357.00 | 100.00 |