SUBSECRETARIA
DE INFRAESTRUCTURA |
DIRECCION
GENERAL DE CONSERVACION DE CARRETERAS |
Programa
Nacional de Conservación de Carreteras |
Avance Físico
- Financiero |
|
|
|
|
|
|
|
DICIEMBRE 2020 |
No. |
NOMBRE DE LA OBRA |
UBICACIÓN |
META |
ASIGNACIÓN |
AVANCE FÍSICO |
AVANCE FINANCIERO
% |
Km inicial |
Km final |
UNIDAD |
% |
|
MÉXICO |
|
|
|
352,365,690.08 |
|
89.15 |
87.10 |
|
|
|
|
|
|
|
|
|
|
RECONSTRUCCIÓN |
|
|
|
67,108,311.24 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Reconstrucción
de Puentes |
|
|
2.00 |
67,108,311.24 |
1.76 |
82.55 |
76.58 |
1 |
PIV Hospital General ( Sta. Barbara - Lím de Edos. Méx./Mor.) |
25+155 |
|
1.00 |
18,302,800.42 |
1.00 |
100.00 |
100.00 |
2 |
Arboles de Navidad ( Sta.
Barbara - Lím de Edos. Méx./Mor.) |
21+800 |
|
1.00 |
48,805,510.82 |
0.76 |
76.00 |
67.80 |
|
|
|
|
|
|
|
|
|
|
Conservación
Periódica |
|
|
54.20 |
152,345,509.97 |
45.70 |
85.76 |
87.21 |
|
|
|
|
|
|
|
|
|
|
Recuperación de 10.0 cm y Carpeta de 5.0 cm |
|
|
19.70 |
72,046,890.15 |
19.20 |
96.82 |
100.00 |
3 |
Monumento -
Valle de Bravo |
0.00 |
1.20 |
1.20 |
4,040,017.62 |
1.20 |
100.00 |
100.00 |
4 |
Toluca-Lím.
Edos. Méx./Gro. (Cpo. A) |
7.00 |
12.50 |
5.50 |
15,231,764.51 |
5.50 |
100.00 |
100.00 |
5 |
Toluca-Lím.
Edos. Méx./Gro. (Cpo. B) |
7.00 |
12.50 |
5.50 |
15,718,907.91 |
5.50 |
100.00 |
100.00 |
6 |
México - La
Marquesa (Cpo. B) |
37.00 |
40.50 |
3.50 |
18,722,660.94 |
3.50 |
100.00 |
100.00 |
7 |
México - La
Marquesa (Cpo. B) |
40.50 |
44.50 |
4.00 |
18,333,539.17 |
3.50 |
87.50 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Microcarpeta de 3.0 cm |
|
|
0.80 |
1,668,888.64 |
0.80 |
100.00 |
100.00 |
8 |
Libramiento
Amecameca |
3.10 |
3.90 |
0.80 |
1,668,888.64 |
0.80 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Fresado y
Carpeta de 5.0 cm |
|
|
10.00 |
26,886,826.58 |
10.00 |
100.00 |
99.76 |
9 |
Ecatepec - Lím.
de Edos. Méx/Hgo. (Cpo.A) |
31.00 |
36.00 |
5.00 |
13,330,188.58 |
5.00 |
100.00 |
100.00 |
10 |
San
Bernardino-Gpe. Victoria (Cpo. A) |
32.00 |
37.00 |
5.00 |
13,556,638.00 |
5.00 |
100.00 |
99.52 |
|
|
|
|
|
|
|
|
|
|
Carpeta de 5.0 cm |
|
|
23.70 |
51,742,904.60 |
15.70 |
62.49 |
62.48 |
11 |
Venta de Carpio
-Tulancingo |
16.00 |
20.00 |
4.00 |
8,168,140.00 |
4.00 |
100.00 |
100.00 |
12 |
Jorobas-Tula
(Cpo. A) |
0.00 |
5.90 |
5.90 |
12,481,463.35 |
5.90 |
100.00 |
100.00 |
13 |
Ramal salida
Norte de Texcoco (Cpo. A) |
0.00 |
1.80 |
1.80 |
4,434,031.79 |
1.80 |
100.00 |
99.90 |
14 |
Toluca-Lím. de
Edos. Méx./Gro. |
86.00 |
90.00 |
4.00 |
7,249,350.75 |
4.00 |
100.00 |
100.00 |
15 |
Temascaltepec -
Tejupilco (T.A.) |
68.00 |
95.00 |
8.00 |
19,409,918.71 |
0.00 |
0.00 |
0.00 |
|
|
|
|
|
|
|
|
|
|
Conservación
Periódica de Puentes |
|
|
4.00 |
3,083,827.54 |
4.00 |
100.00 |
100.00 |
16 |
PSV Chalma
Carr. México-Toluca |
34+250 |
|
1.00 |
784,000.00 |
1.00 |
100.00 |
100.00 |
17 |
Pte. Vehicular Outlet Lerma Carr. México-Toluca |
48+600 |
|
1.00 |
754,000.00 |
1.00 |
100.00 |
100.00 |
18 |
PSV San Pedro Tultepec Der. Carr. México-Toluca |
50+200 |
|
1.00 |
525,027.54 |
1.00 |
100.00 |
100.00 |
19 |
PSV San Pedro Tultepec Izq. Carr. México-Toluca |
50+200 |
|
1.00 |
1,020,800.00 |
1.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Puntos de
conflicto |
|
|
1.00 |
32,879,096.24 |
1.00 |
100.00 |
92.60 |
20 |
Texcoco - Calpulalpan |
32+000 |
|
1.00 |
29,329,096.24 |
1.00 |
100.00 |
91.70 |
|
Finiquito 2019 |
|
|
finiquito |
3,550,000.00 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Conservación
Rutinaria de Tramos |
|
|
741.91 |
46,345,426.61 |
741.91 |
100.00 |
92.95 |
|
México-Toluca |
|
|
123.65 |
6,769,780.79 |
123.65 |
100.00 |
100.00 |
|
Toluca-Cd.
Altamirano |
|
|
123.65 |
6,189,398.14 |
123.65 |
100.00 |
100.00 |
|
Toluca-Morelia
y Toluca-Taxco |
|
|
123.65 |
5,801,724.04 |
123.65 |
100.00 |
100.00 |
|
Venta de Carpio-Tulancingo, México-Pachuca y Jorobas-Tula |
|
|
123.65 |
6,820,855.97 |
123.65 |
100.00 |
100.00 |
|
Toluca-Palmillas
y Naucalpan-Toluca |
|
|
123.65 |
7,275,647.43 |
123.65 |
100.00 |
100.00 |
|
Los Reyes-Zacatepec, México-Puebla y México-Cuautla |
|
|
123.65 |
7,757,619.89 |
123.65 |
100.00 |
100.00 |
|
Tableros
Electrónicos |
|
|
SM |
2,461,212.51 |
|
|
99.99 |
|
Gastos de
Operación |
|
|
GOP |
3,269,187.84 |
|
|
0.00 |
|
|
|
|
|
|
|
|
|
|
Señalamiento
Horizontal |
|
|
741.91 |
27,878,784.94 |
741.91 |
100.00 |
84.47 |
|
Señalamiento
Horizontal |
|
|
741.91 |
5,152,008.98 |
741.91 |
100.00 |
100.00 |
|
Señalamiento
Horizontal |
|
|
SM |
3,626,775.96 |
|
|
100.00 |
|
Señalamiento
Horizontal |
|
|
SM |
19,100,000.00 |
|
|
77.33 |
|
|
|
|
|
|
|
|
|
|
Señalamiento
Vertical |
|
|
3,300.00 |
11,128,564.83 |
3,300.00 |
100.00 |
100.00 |
|
Señalamiento
Vertical |
|
|
3,300.00 |
6,490,160.11 |
3,300.00 |
100.00 |
100.00 |
|
Señalamiento
Vertical |
|
|
SM |
4,638,404.72 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Conservación
Rutinaria de Puentes |
|
|
375.00 |
3,799,155.79 |
375.00 |
100.00 |
100.00 |
|
Conservación
Rutinaria de Puentes |
|
|
375.00 |
3,799,155.79 |
375.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Otros
Subprogramas |
|
|
|
7,797,012.92 |
|
|
97.20 |
|
Seguimiento |
|
|
SM |
2,894,608.20 |
|
|
100.00 |
|
Estudios y/o
Proyectos (puentes) |
|
|
SM |
2,380,000.00 |
|
|
90.82 |
|
Estudios y/o
Proyectos (tramos) |
|
|
SM |
2,522,404.72 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|