SUBSECRETARIA DE INFRAESTRUCTURA |
DIRECCION
GENERAL DE CONSERVACION DE CARRETERAS |
Programa
Nacional de Conservación de Carreteras |
Avance Físico
- Financiero |
|
|
|
|
|
|
|
DICIEMBRE 2022 |
No. |
NOMBRE DE LA OBRA |
UBICACIÓN |
META |
ASIGNACIÓN |
AVANCE FÍSICO |
AVANCE FINANCIERO
% |
KM INICIAL |
KM FINAL |
UNIDAD |
% |
|
COLIMA |
|
|
|
130,912,801.94 |
|
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
RECONSTRUCCIÓN |
|
|
|
11,280,494.80 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Reconstrucción de Puentes |
|
|
1.00 |
11,280,494.80 |
1.00 |
100.00 |
100.00 |
1 |
El Caracol (Manzanillo - Minatitlán) |
42+500 |
|
1.00 |
11,037,603.32 |
1.00 |
100.00 |
100.00 |
|
Adeudos |
|
|
finiquito |
242,891.48 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Conservación Periódica de Tramos |
|
|
20.20 |
21,277,697.16 |
22.20 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Capa de rodadura de un riego |
|
|
20.20 |
17,779,974.04 |
22.20 |
100.00 |
100.00 |
2 |
Ent. Armería a Población Armería |
267.70 |
269.20 |
1.50 |
2,771,100.98 |
1.50 |
100.00 |
100.00 |
3 |
Colima – Lím.Edos.Col./Jal. (T.A) |
9.20 |
26.80 |
13.20 |
6,207,855.81 |
13.20 |
100.00 |
100.00 |
4 |
Libramiento Manzanillo (Cpo. A) |
0.00 |
3.50 |
3.50 |
3,906,349.81 |
3.50 |
100.00 |
100.00 |
5 |
Ent. Lib. Colima - T Tecoman (Cpo. A y B) |
14.00 |
16.00 |
2.00 |
4,894,667.44 |
4.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Cruces de Ferrocarril |
|
|
1.00 |
3,497,723.12 |
1.00 |
100.00 |
100.00 |
6 |
Libramiento Manzanillo (2 Cpos.) |
5+200 |
|
1.00 |
3,497,723.12 |
1.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Conservación Periódica de Puentes |
|
|
6.00 |
9,748,022.41 |
6.00 |
100.00 |
100.00 |
|
Conservación Periódica de Puentes * |
|
|
3.00 |
6,451,404.39 |
3.00 |
100.00 |
100.00 |
|
Conservación Periódica de Puentes ** |
|
|
3.00 |
3,296,618.02 |
3.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Conservación Rutinaria de Tramos |
|
|
285.21 |
59,709,615.65 |
380.98 |
100.00 |
100.00 |
|
Conservación Rutinaria de Tramos |
|
|
285.21 |
57,938,043.81 |
380.98 |
100.00 |
100.00 |
|
Zona 1 |
|
|
200.82 |
3,169,337.18 |
200.82 |
100.00 |
100.00 |
|
Zona 2 |
|
|
180.16 |
1,956,350.75 |
180.16 |
100.00 |
100.00 |
|
Zona 1 |
|
|
200.82 |
2,480,925.23 |
200.82 |
100.00 |
100.00 |
|
Zona 2 |
|
|
180.16 |
3,856,430.65 |
180.16 |
100.00 |
100.00 |
|
Zona 1 |
|
|
10.80 |
10,713,143.74 |
10.80 |
100.00 |
100.00 |
|
Zona 2 |
|
|
15.60 |
12,018,923.03 |
15.60 |
100.00 |
100.00 |
|
Zona 1 |
|
|
133.28 |
9,637,194.09 |
200.82 |
100.00 |
100.00 |
|
Zona 2 |
|
|
151.93 |
7,891,790.40 |
180.16 |
100.00 |
100.00 |
|
Zona 2 (NUEVO) |
|
|
8.00 |
6,213,948.74 |
8.00 |
100.00 |
100.00 |
|
Gastos de operación |
|
|
|
1,771,571.84 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Señalamiento Horizontal |
|
|
285.14 |
6,482,694.93 |
380.98 |
100.00 |
100.00 |
|
Señalamiento Horizontal (KM) |
|
|
285.14 |
6,482,694.93 |
380.98 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Señalamiento Vertical |
|
|
504.00 |
1,922,299.68 |
504.00 |
100.00 |
100.00 |
|
Señalamiento Vertical (PZA) |
|
|
504.00 |
1,922,299.68 |
504.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Otros Subprogramas |
|
|
|
2,182,248.57 |
|
|
100.00 |
|
Seguimiento y Control |
|
|
|
2,182,248.57 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Emergencias "Daños por Sismo en Septiembre 2022" |
|
|
|
18,309,728.74 |
|
|
100.00 |
|
Emergencias API Zona 1 |
|
|
|
635,751.27 |
|
|
100.00 |
|
Emergencias API Zona 2 |
|
|
|
733,590.81 |
|
|
100.00 |
|
Emergencias API 2 Puentes |
|
|
|
10,349,230.00 |
|
|
100.00 |
|
Emergencias API 4 Puentes |
|
|
|
6,591,156.66 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
(*)
Cihuatlán (Manzanillo-Lims. De Edos. Col./Jal) 43+400, Búhos ( Ent.
Mirador - Ent. Miramar)15+000 y El Dren izquierdo |
|
(Colima -
Ent. Tecomán) 4+900 |
|
|
|
|
|
|
|
|
(**) Chan diablo (Libramiento Manzanillo)
16+238 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|