SUBSECRETARIA DE INFRAESTRUCTURA |
DIRECCION
GENERAL DE CONSERVACION DE CARRETERAS |
Programa
Nacional de Conservación de Carreteras |
Avance Físico -
Financiero |
|
|
|
|
|
|
|
DICIEMBRE 2022 |
No. |
NOMBRE DE LA OBRA |
UBICACIÓN |
META |
ASIGNACIÓN |
AVANCE FÍSICO |
AVANCE FINANCIERO % |
KM INICIAL |
KM FINAL |
UNIDAD |
% |
|
SONORA |
|
|
|
377,250,669.07 |
|
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Reconstrucción |
|
|
|
37,107,747.88 |
|
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Reconstrucción de Puentes |
|
|
3.00 |
37,107,747.88 |
3.00 |
100.00 |
100.00 |
1 |
La Cascada (Moctezuma – Agua Prieta) |
180+950 |
|
1.00 |
11,034,027.57 |
1.00 |
100.00 |
100.00 |
2 |
El Farallon (Hermosillo – Moctezuma) |
159+500 |
|
1.00 |
16,603,946.68 |
1.00 |
100.00 |
100.00 |
3 |
La Soledad (Moctezuma – Agua Prieta) |
191+200 |
|
1.00 |
7,978,611.44 |
1.00 |
100.00 |
100.00 |
|
Río Tajitos (Santa Ana - Sonoyta) |
139+100 |
|
finiquito |
1,204,799.94 |
|
|
100.00 |
|
Pachote (Hermosillo - Ures) |
28+400 |
|
finiquito |
286,362.25 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Conservación Periódica de Tramos |
|
|
98.23 |
216,539,130.97 |
99.21 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Capeta asfáltica de granulometría densa de 3 cm |
|
|
35.00 |
74,778,463.29 |
35.00 |
100.00 |
100.00 |
4 |
Moctezuma - Cumpas |
38.00 |
51.00 |
13.00 |
24,810,564.44 |
13.00 |
100.00 |
100.00 |
5 |
Sonoyta -San Luis Rio Colorado |
76.00 |
92.00 |
16.00 |
39,083,577.62 |
16.00 |
100.00 |
100.00 |
6 |
Lím. de Edos. Chih./Son. - Agua Prieta |
128.00 |
134.00 |
6.00 |
10,884,321.23 |
6.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Renivelaciones y Carpeta asfáltica de granulometría densa de 3
cm |
|
|
54.25 |
111,144,820.97 |
54.25 |
100.00 |
100.00 |
7 |
Agua Prieta - Imurís (Cpo A) |
60.00 |
80.25 |
20.25 |
38,331,174.84 |
20.25 |
100.00 |
100.00 |
8 |
Agua Prieta – Imuris (Cpo. B) |
54.00 |
70.00 |
16.00 |
33,940,054.68 |
16.00 |
100.00 |
100.00 |
9 |
Agua Prieta - Imuris (Cpo. A) |
2.00 |
11.00 |
9.00 |
19,443,735.58 |
9.00 |
100.00 |
100.00 |
10 |
Agua Prieta - Imurís (12 m) |
103.00 |
107.00 |
4.00 |
9,392,200.84 |
4.00 |
100.00 |
100.00 |
11 |
Ramal a Naco |
0.00 |
5.00 |
5.00 |
10,037,655.03 |
5.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Renivelación y Capa de rodadura de un riego |
|
|
8.00 |
10,873,324.26 |
8.00 |
100.00 |
100.00 |
12 |
Hermosillo - Moctezuma |
98.00 |
106.00 |
8.00 |
10,873,324.26 |
8.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Recuperación de Pavimento y Carpeta |
|
|
0.98 |
10,827,284.31 |
1.96 |
100.00 |
100.00 |
13 |
Lim. de Edos. Sin./Son- Navojoa |
69.80 |
70.78 |
0.98 |
10,827,284.31 |
1.96 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Renivelacion y Microcarpeta |
|
|
|
2,870,721.52 |
|
|
100.00 |
|
Santa Ana - Sonoyta (12 m de ancho) |
208.00 |
230.00 |
finiquito |
2,870,721.52 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Bacheo y Microcarpeta |
|
|
|
2,737,015.33 |
|
|
100.00 |
|
Janos - Agua Prieta ALTO DESEMPEÑO |
78.00 |
84.00 |
finiquito |
723,055.87 |
|
|
100.00 |
|
Sonoyta - San Luis Rio Colorado (12.0 m de ancho) ALTO DSEMPEÑO |
177.00 |
193.30 |
finiquito |
2,013,959.46 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Bacheo y Riego de Sello |
|
|
|
2,618,740.59 |
|
|
100.00 |
|
Janos - Agua Prieta (12 m de ancho) |
84.00 |
98.00 |
finiquito |
840,114.61 |
|
|
100.00 |
|
Janos - Agua Prieta (12 m de ancho) |
120.00 |
128.00 |
finiquito |
467,374.93 |
|
|
100.00 |
|
Santa Ana - Sonoyta (12 m de ancho) |
169.40 |
180.00 |
finiquito |
677,359.33 |
|
|
100.00 |
|
Sonoyta - San Luis Rio Colorado (12.0 m de ancho) |
46.00 |
76.00 |
finiquito |
633,891.72 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Bacheo y Carpeta |
|
|
|
688,760.70 |
|
|
100.00 |
|
Agua Prieta - Imuris |
142.30 |
153.70 |
finiquito |
688,760.70 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Atención a Puntos de Conflicto |
|
|
1.00 |
3,015,959.88 |
1.00 |
100.00 |
100.00 |
14 |
Hermosillo – Nogales |
266+000 |
|
1.00 |
3,015,959.88 |
1.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Conservación Rutinaria de Tramos |
|
|
1,495.35 |
99,023,772.39 |
1,637.48 |
100.00 |
100.00 |
|
Conservación Rutinaria de Tramos |
|
|
1,495.35 |
87,434,611.23 |
1,637.48 |
100.00 |
0.00 |
|
Conservación Inmediata de Obras de Drenaje Zona 1 |
|
|
526.10 |
3,649,685.41 |
526.10 |
100.00 |
100.00 |
|
Conservación Inmediata de Obras de Drenaje Zona 2 |
|
|
488.05 |
3,611,934.74 |
488.05 |
100.00 |
100.00 |
|
Conservación Inmediata de Obras de Drenaje Zona 3 |
|
|
481.20 |
2,326,360.77 |
481.20 |
100.00 |
100.00 |
|
Conservación Inmediata de Pavimentos Zona 1 |
|
|
22.00 |
14,792,344.91 |
22.00 |
100.00 |
100.00 |
|
Conservación Inmediata de Pavimentos Zona 2 |
|
|
37.83 |
17,281,701.54 |
37.83 |
100.00 |
100.00 |
|
Conservación Inmediata de Pavimentos Zona 3 |
|
|
18.60 |
14,355,486.65 |
18.60 |
100.00 |
100.00 |
|
Conservacion Rutinaria Anual |
|
|
348.80 |
7,882,018.24 |
361.00 |
100.00 |
100.00 |
|
Conservacion Rutinaria Anual |
|
|
298.20 |
5,674,642.92 |
303.44 |
100.00 |
100.00 |
|
Conservacion Rutinaria Anual |
|
|
251.58 |
5,512,863.55 |
309.78 |
100.00 |
100.00 |
|
Conservacion Rutinaria Anual |
|
|
296.27 |
6,555,833.49 |
351.33 |
100.00 |
100.00 |
|
Conservacion Rutinaria Anual |
|
|
300.50 |
5,791,739.01 |
311.93 |
100.00 |
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no.(2021-26-CB-A-001-W-00-2021)) |
|
|
finiquito |
584,073.34 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no.(2021-26-CB-A-002-W-00-2021)) |
|
|
finiquito |
872,088.48 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no.(2021-26-CB-A-003-W-00-2021) |
|
|
finiquito |
540,261.40 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no(2021-26-CB-A-004-W-00-2021)) |
|
|
finiquito |
508,614.42 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no(2021-26-CB-A-005-W-00-2021)) |
|
|
finiquito |
679,507.00 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no(2021-26-CB-A-006-W-00-2021)) |
|
|
finiquito |
154,466.83 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no(2021-26-CB-A-007-W-00-2021)) |
|
|
finiquito |
629,266.76 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no(2021-26-CB-A-008-W-00-2021)) |
|
|
finiquito |
902,685.33 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no(2021-26-CB-A-009-W-00-2021)) |
|
|
finiquito |
856,335.23 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no(2021-26-CB-A-010-W-00-2021)) |
|
|
finiquito |
1,072,426.01 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no(2021-26-CB-A-015-W-00-2021)) |
|
|
finiquito |
22,842.14 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no(2021-26-CB-A-016-W-00-2021)) |
|
|
finiquito |
49,706.20 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no(2021-26-CB-A-017-W-00-2021)) |
|
|
finiquito |
38,933.73 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no.(2020-26-CB-A-005-W-00-2020)) |
|
|
finiquito |
289,738.23 |
|
|
100.00 |
|
Conservación Rutinaria de Tramos(contrato
no.(2020-26-CB-A-035-W-00-2020)) |
|
|
finiquito |
275,429.65 |
|
|
100.00 |
|
Emergencia 2021 (contrato no(2021-26-CB-A-064-W-00-2021)) |
|
|
finiquito |
356,965.44 |
|
|
100.00 |
|
Gastos de Operación |
|
|
|
3,755,820.97 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Señalamiento Horizontal |
|
|
574.90 |
9,143,717.48 |
574.90 |
100.00 |
100.00 |
|
Señalamiento Horizontal |
|
|
324.90 |
4,540,007.56 |
324.90 |
100.00 |
100.00 |
|
Señalamiento Horizontal |
|
|
250.00 |
2,960,049.46 |
250.00 |
100.00 |
100.00 |
|
Señalamiento Horizontal 2021-26-CB-A-048-W-00-2021 |
|
|
finiquito |
1,175,931.25 |
|
|
100.00 |
|
Señalamiento Horizontal 2020-26-CB-A-066-W-00-2020 |
|
|
finiquito |
220,070.63 |
|
|
100.00 |
|
Señalamiento Horizontal 2021-26-CB-A-047-W-00-2021 |
|
|
finiquito |
247,658.58 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Señalamiento Vertical |
|
|
|
3,628,239.06 |
|
|
100.00 |
|
Señalamiento Vertical
2021-26-CB-A-044-W-00-2021 |
|
|
finiquito |
2,519,125.34 |
|
|
100.00 |
|
Señalamiento Vertical
2020-26-CB-A-031-W-00-2020 |
|
|
finiquito |
143,068.36 |
|
|
100.00 |
|
Señalamiento Vertical
2020-26-CB-A-032-W-00-2020 |
|
|
finiquito |
267,762.67 |
|
|
100.00 |
|
Señalamiento Vertical
2021-26-CB-A-043-W-00-2021 |
|
|
finiquito |
698,282.69 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Barreras de Protección |
|
|
1,980.00 |
5,304,178.60 |
1,980.00 |
100.00 |
100.00 |
|
Barreras de Protección |
|
|
1,980.00 |
5,304,178.60 |
1,980.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Conservación Rutinaria de Puentes |
|
|
|
237,542.30 |
|
|
100.00 |
|
Conservación Rutinaria de Puentes 2021-26-CB-A-040-W-00-2021 |
|
|
finiquito |
82,664.77 |
|
|
100.00 |
|
Conservación Rutinaria de Puentes 2021-26-CB-A-041-W-00-2021 |
|
|
finiquito |
77,546.65 |
|
|
100.00 |
|
Conservación Rutinaria de Puentes 2021-26-CB-A-042-W-00-2021 |
|
|
finiquito |
77,330.88 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Otros Subprogramas |
|
|
|
3,250,380.51 |
|
|
100.00 |
|
Seguimiento y Control |
|
|
|
3,250,380.51 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|