SUBSECRETARIA DE INFRAESTRUCTURA |
DIRECCION
GENERAL DE CONSERVACION DE CARRETERAS |
Programa
Nacional de Conservación de Carreteras |
Avance Físico
- Financiero |
|
|
|
|
|
|
|
CIERRE
2023 |
No. |
NOMBRE DE LA OBRA |
UBICACIÓN |
META |
ASIGNACIÓN |
AVANCE FÍSICO |
AVANCE FINANCIERO
% |
KM INICIAL |
KM FINAL |
UNIDAD |
% |
|
MÉXICO |
|
|
|
203,401,009.16 |
|
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
RECONSTRUCCIÓN |
|
|
|
10,986,547.26 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Reconstrucción de Puentes |
|
|
3.00 |
10,986,547.26 |
3.00 |
100.00 |
100.00 |
1 |
P.P La Cantina (Puente Nuevo) |
43+000 |
|
1.00 |
3,912,215.77 |
1.00 |
100.00 |
100.00 |
2 |
P.P San Blas (Nacualpan-Toluca) |
52+000 |
|
1.00 |
3,709,292.54 |
1.00 |
100.00 |
100.00 |
3 |
PIP "Chapingo" Texcoco-Ecatepec |
19+200 |
|
1.00 |
3,365,038.95 |
1.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Conservación Periódica de Tramos |
|
|
16.71 |
86,466,326.21 |
16.71 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Fresado y Carpeta de 5 cm |
|
|
10.84 |
45,302,028.43 |
10.84 |
100.00 |
100.00 |
4 |
Zinacantepec - Lim Edos. Méx./Mich. |
49.10 |
52.20 |
3.10 |
11,353,687.95 |
3.10 |
100.00 |
100.00 |
5 |
Tenango-Lím. Edos. Méx./Gro. |
43.90 |
44.80 |
0.90 |
4,784,202.73 |
0.90 |
100.00 |
100.00 |
6 |
Atlacomulco-Lím. Edos. Méx./-Qro. (Cpo. A) (T.A.) * |
69.20 |
73.00 |
2.90 |
5,526,879.28 |
2.90 |
100.00 |
100.00 |
7 |
Chalco-Amecameca (Cpo. A) |
11.40 |
15.00 |
0.01 |
3,355,300.78 |
0.01 |
100.00 |
100.00 |
8 |
Chalco-Amecameca (Cpo. B) |
22.00 |
24.30 |
2.30 |
7,302,700.00 |
2.30 |
100.00 |
100.00 |
9 |
Chalco-Amecameca (Paso por Tlalmanalco) |
15.60 |
20.00 |
0.90 |
3,804,249.29 |
0.90 |
100.00 |
100.00 |
10 |
Libramiento Amecameca |
0.00 |
0.70 |
0.70 |
2,014,159.06 |
0.70 |
100.00 |
100.00 |
11 |
Ramal Salida Norte de Texcoco (Cpo B) |
0.00 |
1.10 |
0.01 |
1,092,085.70 |
0.01 |
100.00 |
100.00 |
12 |
San Bernardino - Gpe. Victoria (Cpo A) (T.A.) ** |
40.00 |
44.00 |
0.01 |
2,668,046.40 |
0.01 |
100.00 |
100.00 |
13 |
Ixtapaluca - Lim. Edos. Méx./Pue. |
22.00 |
28.00 |
0.01 |
3,400,717.25 |
0.01 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Fresado y Carpeta de 7 cm |
|
|
4.50 |
32,034,690.90 |
4.50 |
100.00 |
100.00 |
14 |
La Marquesa - Lerma (Cpo. B) |
43.50 |
48.00 |
4.50 |
32,034,690.90 |
4.50 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Capa de rodadura de un riego |
|
|
1.37 |
1,702,233.39 |
1.37 |
100.00 |
100.00 |
15 |
Toluca-Lím. de Edos Méx./Gro. |
12.5 |
13.87 |
1.37 |
1,702,233.39 |
1.37 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Fresado de la superficie de rodadura de 5 cm y carpeta asfáltica
de alto desempeño |
|
|
|
6,099,409.55 |
|
|
100.00 |
|
La Marquesa-Lerma (Cpo. A)
(AMAAC Nivel I) (Finiquito) |
42.00 |
48.00 |
finiquito |
1,526,564.91 |
|
|
100.00 |
|
Atlacomulco-Lim. Edos. Méx./Qro. (Cpos A y B) (Finiquito) |
83.00 |
86.00 |
finiquito |
1,294,502.50 |
|
|
100.00 |
|
Los Reyes - Texcoco (Cpo. A)(Finiquito) |
0.00 |
9.00 |
finiquito |
2,395,818.48 |
|
|
100.00 |
|
Atlacomulco-Lim. Edos. Méx./Qro. (Cpos A y B)(Finiquito) |
66.12 |
67.50 |
finiquito |
882,523.66 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Carpeta asfáltica de alto desempeño |
|
|
|
1,065,471.59 |
|
|
100.00 |
|
Ecatepec - Lim. Edos. Mex./Hgo.
(Cpo. A)(Finiquito) |
36.00 |
41.00 |
finiquito |
532,557.59 |
|
|
100.00 |
|
Ecatepec - Lim. Edos. Mex./Hgo.
(Cpo. B)(Finiquito) |
36.00 |
41.00 |
finiquito |
532,914.00 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Microcarpeta |
|
|
|
262,492.35 |
|
|
100.00 |
|
Ecatepec - Lim. Edos. Mex./Hgo. Incluye convenio (Finiquito) |
43.30 |
49.30 |
finiquito |
262,492.35 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Conservación Periódica de Puentes |
|
|
9.00 |
8,022,621.47 |
9.00 |
100.00 |
100.00 |
|
(PSV Periferico La Marquesa) México-Toluca |
|
|
1.00 |
1,925,304.86 |
1.00 |
100.00 |
100.00 |
|
(PSV San Pedro Tultepec Der.) México-Toluca |
|
|
1.00 |
556,746.05 |
1.00 |
100.00 |
100.00 |
|
(PSV Chimalhuacan) México-Zacatepec |
|
|
1.00 |
2,547,771.85 |
1.00 |
100.00 |
100.00 |
|
(Hacienda Panoaya I) México-Cuautla |
|
|
1.00 |
564,563.08 |
1.00 |
100.00 |
100.00 |
|
(Hacienda Panoaya II) México-Cuautla |
|
|
1.00 |
564,563.08 |
1.00 |
100.00 |
100.00 |
|
(Arboles de Navidad) México-Cuautla |
|
|
1.00 |
473,364.43 |
1.00 |
100.00 |
100.00 |
|
(Psv San Bernardino) Texcoco-Ecatepec |
|
|
1.00 |
473,364.43 |
1.00 |
100.00 |
100.00 |
|
(PSV Viaducto Elevado I) Libramiento Acambay |
|
|
1.00 |
211,138.35 |
1.00 |
100.00 |
100.00 |
|
(PSV Viaducto Elevado II Der.) Libramiento Acambay |
|
|
1.00 |
705,805.35 |
1.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Atención a Puntos de Conflicto |
|
|
5.00 |
11,566,190.10 |
5.00 |
100.00 |
100.00 |
16 |
Atlacomulco-Lím. Edos Méx./Qro |
82.00 |
82.80 |
1.00 |
3,440,674.50 |
1.00 |
100.00 |
100.00 |
17 |
Atlacomulco-Lím. Edos Méx./Qro |
92.70 |
93.60 |
1.00 |
2,629,701.02 |
1.00 |
100.00 |
100.00 |
18 |
Atlacomulco-Lím. Edos Méx./Qro |
119.00 |
120.00 |
1.00 |
5,495,814.57 |
1.00 |
100.00 |
100.00 |
|
Toluca-Lím. Edos Méx./Gro |
94.00 |
95.00 |
1.00 |
0.00 |
1.00 |
100.00 |
|
|
Toluca-Lím. Edos Méx./Gro |
72.00 |
72.50 |
1.00 |
0.00 |
1.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
|
Conservación Rutinaria de Tramos |
|
|
792.98 |
68,768,010.70 |
1,149.33 |
100.00 |
100.00 |
|
Conservación rutinaria anual de tramos Zona Toluca I |
|
*** |
161.48 |
19,040,982.48 |
296.56 |
100.00 |
100.00 |
|
Conservación rutinaria anual de tramos Zona Toluca II |
|
|
310.12 |
20,951,588.33 |
344.19 |
100.00 |
100.00 |
|
Conservación rutinaria anual de tramos Zona Texcoco |
|
|
321.38 |
23,967,447.87 |
508.58 |
100.00 |
100.00 |
|
Adeudo ajuste de costos Conservación Rutinaria Anual Zona Toluca
II (Finiquito) |
|
|
finiquito |
1,019,782.27 |
|
|
100.00 |
|
Adeudo ajuste de costos Rutinaria de Fracciones Toluca I
(Finiquito) |
|
|
finiquito |
733,397.87 |
|
|
100.00 |
|
Adeudo ajuste de costos Rutinaria de Fracciones Toluca II
(Finiquito) |
|
|
finiquito |
579,399.02 |
|
|
100.00 |
|
Adeudo ajuste de costos
Rutinaria Obras de drenaje Toluca II (Finiquito) |
|
|
finiquito |
384,509.03 |
|
|
100.00 |
|
Adeudo ajuste de costos Rutinaria de Fracciones Texcoco
(Finiquito) |
|
|
finiquito |
787,841.42 |
|
|
100.00 |
|
Gastos de Operación |
|
|
|
1,303,062.41 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
Señalamiento Horizontal |
|
|
691.60 |
9,597,538.45 |
691.60 |
100.00 |
100.00 |
|
Señalamiento Horizontal |
|
|
691.60 |
9,597,538.45 |
691.60 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Conservación Rutinaria de Puentes |
|
|
378.00 |
4,646,830.13 |
378.00 |
100.00 |
100.00 |
|
Conservación Rutinaria de Puentes |
|
|
378.00 |
4,646,830.13 |
378.00 |
100.00 |
100.00 |
|
|
|
|
|
|
|
|
|
|
Otros Subprogramas |
|
|
|
3,346,944.84 |
|
|
100.00 |
|
Seguimiento |
|
|
|
3,346,944.84 |
|
|
100.00 |
|
|
|
|
|
|
|
|
|
|
* km 69.2 al km
71.0 y del km 71.9 al km 73.0 |
|
|
|
|
|
|
|
|
** km 40.0 al 43.2
y del km 43.7 al km 44.0 |
|
|
|
|
|
|
|
|
*** El aumento en los km. atendidos se debio
principalmente a los |
|
|
|
|
|
|
|
km. incrementados por los tramos del (AIFA) asi
como a todos los |
|
|
|
|
|
|
|
km. de las gasas de la carretera Toluca-Palmillas |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|